Slab pre-pour inspection in Morayfield

Steel, vapour barriers and formwork, checked hours before the concrete goes in.

  • The day before the pour, after reo is set
  • About 1 hour on site
  • Report within 24 hours
Get a quoteWe’ll send a quote to your inbox once we have your details

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage2 of 7
When to bookThe day before the pour, after reo is set
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, NCC Part 3.2, the engineer's slab design and the soil report

What is included in a Morayfield slab pre-pour inspection

  • Steel mesh height confirmed against the plan
  • Bar spacing measured and tied
  • Slab thickness at the edge and centre
  • Vapour barrier unbroken and taped
  • Plastic edge strip in place
  • Sleeves for plumbing and electrical
  • Reinforcement extended past slab steps
  • Bottom bars in wide beams
  • Shower wet area set-downs formed
  • Concrete cover to reinforcement
  • Slab free of standing water
  • Curing water or sheeting applied
  • Termite barriers to penetrations
Why it matters here

Slab pre-pour inspections on Morayfield builds

Morayfield builds have shown us a few common issues. Vapour barrier laps are not long enough in some spots. Termite collars sometimes sit too high or too low on the service pipes. Bar chairs can be loose on the mesh. Edge beams lack the extra bottom bar in wider sections. One recent job had a step without any reinforcement extensions, a detail the engineer needed to approve before the pour.

What we find at this stage in Morayfield

  • Reinforcing bar absent at step changes
  • Vapour barrier laps not long enough
  • Termite collar height not correct
  • Loose bar chairs on mesh
  • No extra bar in wider edge beams
Joints are not sealed, recorded during a slab pre-pour inspection in Morayfield
The inspector found that vapour barrier joints were not sealed
Sample findings

Sample defects found during our slab pre-pour inspections in Morayfield

Annotated findings from Slab pre-pour inspections.

Damaged slab edge rebate, recorded during a slab pre-pour inspection in Morayfield
The inspector found damage to the concrete slab edge rebate which can let water into the building
Trimming required, recorded during a slab pre-pour inspection in Morayfield
The shower concrete recess extends past the wall frame, making it difficult to install plaster correctly
Extension required, recorded during a slab pre-pour inspection in Morayfield
The concrete recess penetrated under the wall frame, which prevents the plaster from sitting correctly
Shower recess not formed, recorded during a slab pre-pour inspection in Morayfield
The shower recess was not formed yet and needs to be installed before the concrete is poured

The other stages of a Morayfield build

  1. Bored piers inspection in Morayfield1Bored piersAfter piers are formed, before concreting
  2. Frame inspection in Morayfield3FrameFrame and trusses standing, roof on, before linings
  3. Lock-up (pre-plaster) inspection in Morayfield4Lock-up (pre-plaster)Cladding on, windows in, before plaster
  4. Fixing inspection in Morayfield5FixingJoinery and doors in, before painting
  5. Waterproofing inspection in Morayfield6WaterproofingMembrane set, before the tiler starts
  6. Pre-handover (PCI) inspection in Morayfield7Pre-handover (PCI)Pre-handover inspection checklist

All construction stage inspections in Morayfield →

Guides

Construction stage guides for Morayfield

All guides →

Book a slab pre-pour inspection in Morayfield

Instant online pricing for Morayfield, or contact the booking team.

FAQ

Slab pre-pour inspections in Morayfield: common questions

What happens if steps lack reinforcement extensions?

The builder adds the steel or the engineer approves a different detail before the pour. Once concrete is down, fixing it requires cutting and patching.

Why do vapour barrier laps matter?

If the laps are too short, water vapour can pass through and cause problems under the floor.

What is wrong with loose bar chairs?

Loose chairs let the mesh sink or shift, so the steel ends up in the wrong place in the concrete.

Is the inspection completed in a day?

Around an hour for a standard slab on a new build.

Can we inspect the day of the pour?

We can only see what is exposed before the concrete arrives. We do not inspect after the pour has started.

Is the steel checked under the barrier?

Yes, we look for the correct concrete cover and that the mesh is sitting at the right height.