Morayfield Building
Inspections

Handover inspection in Morayfield

When the handover inspection is complete, you can hold the remaining payment until the building defect report is ready.

  • Pre-handover inspection checklist
  • 2 to 3 hours on site
  • Report within 24 hours
Get a quoteWe’ll send a quote to your inbox once we have your details

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage7 of 7
When to bookPre-handover inspection checklist
Time on site2 to 3 hours on site
Inspected againstThe QBCC Standards and Tolerances Guide, the NCC, your contract drawings and inclusions

What is included in a Morayfield pre-handover (PCI) inspection

  • Blocked and open weep holes detected
  • Cavity flashings in place
  • Balcony floor waste and overflow
  • Bedded balcony tiles
  • Cladding capping over joints
  • Restrictors for first floor windows
  • Ground subsidence near the house
  • Cladding clear of ground
  • Isolation joints to paths
  • Paint and plaster finished
  • Door and frame hardware
  • Tile grout and silicone
  • Roof inspected for condition
  • Final lockup check
Why it matters here

Pre-handover (PCI) inspections on Morayfield builds

The Morayfield handover list often lands on water and edges. Box gutters discharging into other box gutters, sumps and overflows that were never sized for the roof above them, balcony outlets too small for the area they drain, and balustrades simply not installed where there is a fall. We also check that stormwater is clear and that the shower area has the correct lighting.

What we find at this stage in Morayfield

  • Box gutter connected to another box gutter
  • Sump and drain sizing too small
  • Balcony water cannot drain quickly
  • Missing rails required where there is a fall
  • Driveways missing isolation joints
Bedroom 2, recorded during a handover inspection in Morayfield
Bedroom 2 has a standard ceiling height
Sample findings

Sample defects found during our pre-handover (PCI) inspections in Morayfield

Annotated findings from Pre-handover (PCI) inspections.

Ensuite, recorded during a handover inspection in Morayfield
The inspector checked the ensuite for defects and structural issues
Bedroom 3, recorded during a handover inspection in Morayfield
Bedroom 3 has no door attached to the frame
Bedroom 4, recorded during a handover inspection in Morayfield
Bedroom 4 is not visible from the inspection access
Bathroom, recorded during a handover inspection in Morayfield
The bathroom was inspected and no issues were found

The other stages of a Morayfield build

  1. Bored piers inspection in Morayfield1Bored piersAfter piers are formed, before concreting
  2. Slab pre-pour inspection in Morayfield2Slab pre-pourThe day before the pour, after reo is set
  3. Frame inspection in Morayfield3FrameFrame and trusses standing, roof on, before linings
  4. Lock-up (pre-plaster) inspection in Morayfield4Lock-up (pre-plaster)Cladding on, windows in, before plaster
  5. Fixing inspection in Morayfield5FixingJoinery and doors in, before painting
  6. Waterproofing inspection in Morayfield6WaterproofingMembrane set, before the tiler starts

All construction stage inspections in Morayfield →

Guides

Construction stage guides for Morayfield

All guides →

Book a pre-handover (pci) inspection in Morayfield

Instant online pricing for Morayfield, or contact the booking team.

FAQ

Pre-handover (PCI) inspections in Morayfield: common questions

Do I book this before or after?

We aim to issue the report about two weeks before the handover inspection. Wait too long and the builder loses the chance to fix issues, turning a simple list of defects into a costly dispute.

Are the repairs checked off correctly?

Yes. The final report lists every task as complete, partial or outstanding so you can take it to the handover inspection.

Do box gutters require specific drainage systems?

Roof plumbing in this area relies heavily on box gutters, which must have proper fall, sumps, and overflow systems to function correctly. If the three main areas are not correct, water ends up in the roof rather than just on a wall.

Will defects delay your settlement?

A solicitor is the best person to advise on this, as the details will depend on what your contract states. We provide a detailed written record of any problems, supported by dated photos to show the full extent of the damage.

Is the damage typical?

A large number of defects can occur during construction. These are normal and do not automatically mean the builder is at fault. We look at the structural issues separately from cosmetic ones in the report.

What happens if the builder challenges a defect?

We list every specific clause, tolerance or rule that is not met, which puts the focus on the actual requirements. Where it cannot be resolved, the dispute process under the Queensland Building and Construction Commission Act 1991 is the next step.

Get a Free Quote